An Asbestos management plan in Brisbane is devised to help inhabitants of the ACM (asbestos containing material) building to manage the risk of exposure. It clearly states where the material is peasant and how it is supposed to be managed for safety measures.
The process of asbestos management plan includes an asbestos survey that helps see where the material is present and its risk of exposure. The management devises the plan and makes the copy accessible for workers or inhabitants to control the exposure risk.
Asbestos management plan is set out with clear objectives, aims, what needs to be done, where it needs to be done and for how long incase of airborne asbestos exposure. The plan must include the following points:
Asbestos management plan in Brisbane
- The register record of asbestos present in the building from the first date and needs to be updated on an annual basis till the building stands.
Details of every bit involving the following points must be included in asbestos survey and management plan:
- Identification of the asbestos present in the building
- When it was installed and which company and workers.
- What was the reason for this decision and the safety measure behind it.
- The procedure in case of exposure and incidents related to asbestos.
- A timetable of managing the ACM airborne exposure risk and measure including proper date and reviewed report.
- If there are any other procedures are done at the building such as air monitoring or survey.
- If there is proper training done for the inhabitant to lessen the risk and consultation done for proper measures.
- Person who has taken the responsibility for management and regular update of the plan.
The asbestos management in Brisbane plan must be written in identified asbestos and naturally occurring asbestos at any building. The plan must be available for workers Asbestos management plan in Brisbane and other staff at the building. It must be reviewed every five years and kept updated under these circumstances:
- When asbestos controls are being reviewed
- When asbestos is distrubed, sealed, enclosed or removed.
- When the new area is identified or the previous area becomes accessible.
The asbestos management plan is an on-going process and you need to make sure it keeps updated with a proper record. It is recommended to renew and re-inspect ACM in the building to ensure safety.